The mission of the Concession Company, AKA Alföld Concession Company Ltd. is to finance, to build, to operate and to maintain the M5 Motorway between chainages 17+400 km and 173+895, which connects Budapest and Röszke state border and 156,5 km long.
Between 1998 and 2006 there were three phases and for 2006 the full length of the motorway was handed over.
On the motorway covered by asphalt surface with 2×2 traffic lanes and an emergency lane, there are15 intersections and 111 pieces of well-preserved objects ensures safe traffic. For travellers there are 18 rest areas with several rest area services.
SIGNING THE CONCESSION CONTRACT
MAY 1994
FOUNDING AKA ALFÖLD KONCESSZIÓS AUTÓPÁLYA ZRT.
JULY 1994
STARTING TOLL COLLECTION
JANUARY 1997
FINISHING THE CONSTRUCTION OF PHASE I.
MAY 1998
THE STATE MOTORWAY COMPANY (ÁLLAMI AUTÓPÁLYA KEZELŐ RT.) BUYS THE 39,48% OF THE SHARES
INITIATING THE AVAILABILITY FEE SYSTEM
SIGNING THE CONTRACT FOR THE CONSTRUCTION OF PHASE II.
MARCH 2004
HANDING OVER OF PHASE II.
DECEMBER 2005
HANDING OVER OF PHASE III.
MARCH 2006
HANDING OVER LAJOSMIZSE WEIGH STATION
FEBRUARY 2007
THE STATE MOTORWAY COMPANY (ÁLLAMI AUTÓPÁLYA KEZELŐ ZRT.) SELLS ITS SHARES TO M5 HOLDING GMBH
MARCH 2008
THE ONLY SHAREHOLDER OF AKA ZRT. IS M5 HOLDING GMBH. (DAUGHTER COMPANY OF STRABAG SE)
JUNE 2008M5 Motorway is ready for winter maintenance
AKA Alföld Koncessziós Autópálya Zrt. and the M5 Motorway Operating Company, A-WAY Zrt. have prepared their maintenance fleet for winter operation, which is ready to handle winter weather with regular road control service from November 10, 2020. At three operation and maintenance centres – in Újhartyán, Kiskunfélegyháza and Balástya – the special vehicles and adapters are ready for the winter.