Road surface repair works will be carried out on the M5 Motorway in the proximity of Örkény between 10th September and 9th October 2022 in the direction of Szeged between chainage 53 and 60. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.

The repairs will expectedly start on 10th September 2022 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged will be temporarily diverted into the fast lane with closing the slow lane and the emergency lane between chainage 53 and 60 km. The repair works will also affect traffic in the direction of Budapest. After the traffic diversion takes effect, travelers heading in the direction of Szeged can temporarily also use the fast lane of the opposite side. During the road surface repairs, the traffic in the direction of Budapest will be temporarily diverted into the slow lane and the emergency lane. Entering and leaving the Örkény rest area will remain available during the entire duration of the temporary diversion. The repair works will not affect any interchanges. The road surface repair works are expected to be completed by 9th October 2022. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section.

Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website www.utinform.hu, and by AKA Ltd. on their website www.aka.hu as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.

We wish you a safe trip!
AKA Ltd.

 

For further information and interviews please contact:

PResston PR

E-mail: info@presstonpr.hu
Terdik Adrienne, managing director
M: +36302576008, +36308316456
T: +3613259488

Accessibility