2025. 11. 10.
WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS
| 156,6 km motorway section |
| 3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya) |
| 12 dual-purpose vehicles |
| 6 multifunctional Unimogs, 3 loading vechicles |
| 5840 tons of sodium chloride |
| 18 tons of calcium chloride |
| Monitoring the road conditions every 2 hours during the daytime |
2025. 06. 24.
The safety of road workers is all of our responsibility!
For the second year in a row, the European Association of Operators of Toll Road Infrastructures (ASECAP) is organizing the traffic safety campaign on June 25th, which draws attention to the protection of road workers. After several European countries, AKA Ltd. joined the campaign as well.