2026. 02. 10.
Kunszállás interchange at km section 102 on M5 Motorway has opened for traffic.
The new Kunszállás interchange, built at kilometer section 102 of the M5 motorway, was opened to traffic on 10th February 2026. The new interchange provides direct access to – and exit from the M5 motorway. We ask drivers to use the new interchange by paying extra attention and to keep the rules indicated on the traffic signs.
2025. 11. 10.
WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS
| 156,6 km motorway section |
| 3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya) |
| 12 dual-purpose vehicles |
| 6 multifunctional Unimogs, 3 loading vechicles |
| 5840 tons of sodium chloride |
| 18 tons of calcium chloride |
| Monitoring the road conditions every 2 hours during the daytime |