MERRY CHRISTMAS AND HAPPY NEW YEAR!


| Type: | Interchange construction works |
| Location: | Both sides of the M5 motorway, in the proximity of Kunszállás between chainage 101 and 104 |
| Expected start of maintenance: | 7th November 2025 |
| Speed limit: | 100 km/h |
WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS
| 156,6 km motorway section |
| 3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya) |
| 12 dual-purpose vehicles |
| 6 multifunctional Unimogs, 3 loading vechicles |
| 5840 tons of sodium chloride |
| 18 tons of calcium chloride |
| Monitoring the road conditions every 2 hours during the daytime |
| Type: | Interchange construction works |
| Location: | Both sides of the M5 motorway, in the proximity of Kunszállás, between chainage 101 and 104 |
| Expected start of maintenance: | 21st March 2025 |
| Speed limit: | 60 km/h |

| Type: | M5-M44 interchange construction works |
| Location: | M5 motorway first in the direction of Budapest, then afterwards in the direction of Szeged, Kecskemét north interchange at chainage 74 |
| Expected start of maintenance: | 10th October 2024 |
| Expected finish of maintenance: | Autumn 2026 |
| Speed limit: | 60 km/h |
