<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2021 | AKA Zrt</title>
	<atom:link href="https://www.aka.hu/en/tag/2021-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.aka.hu</link>
	<description></description>
	<lastBuildDate>Thu, 09 Jun 2022 12:04:18 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://www.aka.hu/wp-content/uploads/2020/04/aka_favicon16x16-01.png</url>
	<title>2021 | AKA Zrt</title>
	<link>https://www.aka.hu</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>M5 Motorway is ready for winter maintenance</title>
		<link>https://www.aka.hu/en/2021/11/08/m5-motorway-is-ready-for-winter-maintenance/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Sun, 07 Nov 2021 23:56:10 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244231</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>AKA Alföld Koncessziós Autópálya Ltd. and the M5 Motorway Operator Company, A-WAY Ltd. have prepared their maintenance fleet for winter operation, which is ready to handle winter conditions with a regular road control service starting from 10<sup>th</sup> November, 2021. At three operation and maintenance centres – located near Újhartyán, Kiskunfélegyháza and Balástya – the vehicles and their adapters handling the winter maintenance works were prepared and passed the inspections.</strong></p>
<p>AKA Alföld Koncessziós Autópálya Ltd. and the M5 Motorway Operating Company, A-WAY Ltd., carry out tasks instructed for winter operation in accordance with their legal obligations. The motorway and the maintenance fleet are all prepared for the winter season. Training of the workforce has concluded in accordance with the operating regulations.  An on-call service will be provided starting from 10<sup>th</sup> November, 2021, up until 15<sup>th</sup> March, 2022. Depending on weather conditions, the duration of this service can be subject of change.</p>
<p>The winter maintenance of the 156.6-kilometre-long motorway section is managed by three operation and maintenance centres with the help of vehicles specifically adjusted to the winter operation period. De-icing and snow removal on the motorway will be carried out by 11 dual-purpose vehicles. In addition, 6 multifunctional Unimogs capable of disseminating salt and ploughing, 3 for loading and if necessary, 8 additional rented vehicles can help with the winter operation of the motorway.</p>
<p>The maintenance centres are prepared for the de-icing the road surfaces of the motorway. For this purpose, 5057 tons of sodium chloride and 18 tons of calcium chloride is available in the salt storages. At each operation and maintenance centre, the service is managed by a chief supervisor in 12-hour shifts. The drivers also work in 12-hour shifts, while the dispatcher and road patrol service ensures smooth traffic conditions 24 hours a day.</p>
<p>In order to ensure accident-free and continuous traffic flow, the Operator surveys the condition of the motorway with raised attention on the entire road network. During the day road conditions are monitored regularly every two hours, and every four hours between 10 p.m. and 6 a.m.</p>
<p>In order to increase traffic safety, a CCTV camera system is operating, that enable continuous traffic monitoring at interchanges and rest areas as well. Meteorological stations placed along the motorway relay the latest weather data every five minutes. The Operating Company monitors the satellite imagery combined with cloud-based data of the National Meteorological Service, which is updated every 15 minutes. In addition, travellers, who have experienced a mechanical breakdown can request help using emergency telephones which are located every two kilometres.</p>
<p>Accident-free traffic therefore depends on the responsibility of the drivers as well as the condition of their vehicles. In order to ensure a safe and smooth winter travel, we kindly ask everyone to prepare their car for the winter.</p>
<p>Before leaving, we kindly ask you to check the latest road information updates provided by Utinform as well as AKA Ltd., and pay attention to keep the sufficient following distance and traffic rules while travelling!</p>
<p>We wish you an accident-free and safe travel!<br />AKA Ltd.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br /></strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works at the offramp of the Kecskemét-North interchange</title>
		<link>https://www.aka.hu/en/2021/11/08/road-surface-repair-works-at-the-offramp-of-the-kecskemet-north-interchange/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Sun, 07 Nov 2021 23:49:51 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244224</guid>

					<description><![CDATA[On the M5 motorway in the direction of Budapest, the offramp of the Kecskemét-North interchange at chainage 73 will be closed on November 8th and 9th 2021 due to road surface repair works.]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_1 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>On the M5 motorway in the direction of Budapest, the offramp of the Kecskemét-North interchange at chainage 73 will be closed on November 8<sup>th </sup>and 9<sup>th</sup> 2021 due to road surface repair works.</strong></p>
<p>Due to road surface repair works carried out on November 8<sup>th</sup> and 9<sup>th</sup> 2021 at the offramp of the Kecskemét-North interchange on the motorway in the direction of Budapest, leaving the interchange will not be possible for road users. Due to the closure of the interchange offramp, a diversion route will be installed, which will be indicated by yellow-colored information signs for travelers.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_4  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br />
</strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_5  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>M5 Motorway – Bridge repair works in the proximity of Kecskemét</title>
		<link>https://www.aka.hu/en/2021/09/22/m5-motorway-bridge-repair-works-in-the-proximity-of-kecskemet/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Wed, 22 Sep 2021 11:12:47 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244331</guid>

					<description><![CDATA[Bridge repair works have started on M5 Motorway in the direction of Szeged at chainage 87 on 10th September 2021, which will end by 28th October 2021. Due to the repair works a temporary traffic diversion is being installed between chainage 86 and 90. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_2 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_6  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Bridge repair works have started on M5 Motorway in the direction of Szeged at chainage 87 on 10<sup>th</sup> September 2021, which will end by 28<sup>th</sup> October 2021. Due to the repair works a temporary traffic diversion is being installed between chainage 86 and 90. </strong><strong>AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p>Repair works have started on 10<sup>th</sup> September 2021 within the aforementioned section. Between 10<sup>th</sup> September 2021 and 28<sup>th</sup> October 2021, traffic diversion will be implemented during the bridge repair works at chainage 87, in the direction of Szeged, which also affects M5 motorway in the direction of Budapest. The diversion is being installed between chainage 86 and 90.</p>
<p>During the repair works, within the aforementioned section of M5 motorway in the direction of Szeged the fast lane is being diverted to the other side, thus traffic will be able to use two traffic lanes. Due to the diversions within the aforementioned section, two traffic lanes will be available for travelers in the direction of Budapest as well.</p>
<p>The diversion will be indicated by yellow flashing lights for road users. Speed limits of 60 and 80 km/h are to be expected within the aforementioned section, which we kindly ask to comply with.</p>
<p>&nbsp;</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_7  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br /></strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_8  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repairs conducted on the M5 Motorway in the proximity of Kiskunfélegyháza, in the direction of Budapest</title>
		<link>https://www.aka.hu/en/2021/09/14/road-surface-repairs-conducted-on-the-m5-motorway-in-the-proximity-of-kiskunfelegyhaza-in-the-direction-of-budapest/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Tue, 14 Sep 2021 11:24:05 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244338</guid>

					<description><![CDATA[Road surface repair works will be carried out on M5 Motorway in the proximity of Kiskunfélegyháza between 14th and 21th September 2021 in the direction of Budapest between chainage 99 and 106. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_3 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_3  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_9  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><strong>Road surface repair works will be carried out on M5 Motorway in the proximity of Kiskunfélegyháza between 14<sup>th</sup> and 21<sup>th</sup> September 2021 in the direction of Budapest between chainage 99 and 106. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p>The repairs will expectedly start on 14<sup>th</sup> September 2021 on the aforementioned section. On the M5 Motorway the traffic in the direction of Budapest will be diverted from the slow lane into the fast lane with closing the slow and emergency lanes between chainage 99 and 106 km during the road surface repair works. Yellow diversion signs and road marking arrows will indicate the designated routes for road users on the temporary diversion section. The repair works will not affect any of the interchanges or rest areas.</p>
<p>The road surface repair works are expected to be completed by September 21<sup>th</sup> 2021, after which road users will be able to travel on the renewed roads. Speed limits of 60 km/h and 80 km/h are to be expected within the highlighted zone, which we kindly ask to comply with. The restrictions will not affect the M5 Motorway in the direction of Szeged.</p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/terelesi_terv_ill_21P704_57szakasz_v02.jpg" data-rel="lightbox-gallery-yvhgEqqi" data-rl_title="" data-rl_caption="" title=""><img fetchpriority="high" decoding="async" class="aligncenter wp-image-3441 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/terelesi_terv_ill_21P704_57szakasz_v02-1024x427-1.jpg" alt="" width="1024" height="427" /></a></p>
<p>&nbsp;</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_10  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br />
</strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_11  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works conducted on the M5 Motorway in the proximity of Lajosmizse, in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2021/09/13/road-surface-repair-works-conducted-on-the-m5-motorway-in-the-proximity-of-lajosmizse-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 13 Sep 2021 11:38:29 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244353</guid>

					<description><![CDATA[Road surface repair works will be carried out on M5 Motorway at Lajosmizse interchange and rest area located near chainage 67 between 13th September and 8th October 2021 in the direction of Szeged. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_4 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_4">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_4  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_12  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on M5 Motorway at Lajosmizse interchange and rest area located near chainage 67 between 13<sup>th</sup> September and 8<sup>th</sup> October 2021 in the direction of Szeged. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p>The repairs will expectedly start on 13<sup>th</sup> September 2021 on the aforementioned section. During the repair works the petrol station and the entire interchange located near Lajosmizse interchange and rest area at chainage 67 will be closed between 17<sup>th</sup> September 2021 and 24<sup>th</sup> September 2021. Yellow diversion signs will indicate the designated routes for road users on the temporary diversion section. During the repair works the rest area and petrol station in the proximity of Inárcs and Örkény will be available for travelers.</p>
<p>The complete closure of the petrol station and the interchange is expected to be completed by 24<sup>th</sup> September, 2021, after which Lajosmizse rest area and the petrol station will be operational again, and exiting the motorway will be ensured. However, entering the motorway between 22<sup>nd</sup> September 2021 and 25<sup>th</sup> September 2021 is only possible through the rest area. Speed limits of 40 km/h and 60 km/h are to be expected within the highlighted zone, which we kindly ask to comply with. The restrictions will not affect the M5 Motorway in the direction of Budapest.</p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_2utem01.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3464 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_2utem01-1024x597-1.jpg" alt="" width="1024" height="597" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_2utem02.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3465 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_2utem02-1024x631-1.jpg" alt="" width="1024" height="631" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_2utem03.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3463 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_2utem03-1024x529-1.jpg" alt="" width="1024" height="529" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_3utem.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3469 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_3utem-1024x631-1.jpg" alt="" width="1024" height="631" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_4utem.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3466 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_4utem-1024x631-1.jpg" alt="" width="1024" height="631" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_5utem.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3467 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_5utem-1024x631-1.jpg" alt="" width="1024" height="631" /></a><a href="https://www.aka.hu/en/wp-content/uploads/2021/09/21P701_6utem.jpg" data-rel="lightbox-gallery-DU9kDURN" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3468 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P701_6utem-1024x631-1.jpg" alt="" width="1024" height="631" /></a></p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_13  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br /></strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_14  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repairs conducted on the M5 Motorway in the proximity of Kiskunfélegyháza, in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2021/08/06/road-surface-repairs-conducted-on-the-m5-motorway-in-the-proximity-of-kiskunfelegyhaza-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Fri, 06 Aug 2021 11:43:31 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244365</guid>

					<description><![CDATA[Road surface repair works will be carried out on M5 Motorway in the proximity of Kiskunfélegyháza between 6th and 14th August 2021 in the direction of Szeged between chainage 99 and 105. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_5 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_5">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_5  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_15  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><strong>Road surface repair works will be carried out on M5 Motorway in the proximity of Kiskunfélegyháza between 6<sup>th</sup> and 14<sup>th</sup> August 2021 in the direction of Szeged between chainage 99 and 105. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p>The repairs will expectedly start on 6<sup>th</sup> August 2021 on the aforementioned section. On the M5 Motorway the traffic in the direction of Szeged will be diverted from the slow lane into the fast lane with closing the slow and emergency lanes between chainage 99 and 105 km during the road surface repair works. Yellow diversion signs and road marking arrows will indicate the designated routes for road users on the temporary diversion section. The repair works will not affect any of the interchanges or rest areas.</p>
<p>The road surface repair works are expected to be completed by August 14<sup>th</sup> 2021, after which road users will be able to travel on the renewed roads. Speed limits of 60 km/h and 80 km/h are to be expected within the highlighted zone, which we kindly ask to comply with. The restrictions will not affect the M5 Motorway in the direction of Budapest.</p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/08/terelesi_terv_ill_21P703_20szakasz_Artboard-2.jpg" data-rel="lightbox-gallery-QvJ92vVR" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3428 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/terelesi_terv_ill_21P703_20szakasz_Artboard-2-1024x427-1.jpg" alt="" width="1024" height="427" /></a></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_16  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.</p>
<p><strong>For further information and interviews please contact:</strong></p>
<p><strong>PResston PR<br />
</strong>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_17  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the rest area at Kecskemét south interchange on M5 motorway</title>
		<link>https://www.aka.hu/en/2021/07/13/road-surface-repair-works-in-the-rest-area-at-kecskemet-south-interchange-on-m5-motorway/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Tue, 13 Jul 2021 11:47:33 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244371</guid>

					<description><![CDATA[Road surface repair works will be carried out at Kecskemét south interchange located at chainage 90, M5 Motorway between 12th July and 7th August 2021. During the repair works, the offramp of Kecskemét south interchange and the rest area are partially available pursuant to the works scheduled. The petrol station will continue to remain accessible during this period. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repair works. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_6 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_6">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_6  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_18  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><strong>Road surface repair works will be carried out at Kecskemét south interchange located at chainage 90, M5 Motorway between 12<sup>th</sup> July and 7<sup>th</sup> August 2021. During the repair works, the offramp of Kecskemét south interchange and the rest area are partially available pursuant to the works scheduled. The petrol station will continue to remain accessible during this period. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repair works.</strong></p>
<p>In the first phase of the road surface repair works – carried out between 12<sup>th</sup> and 23<sup>rd</sup> July &#8211; the rest area and the MOL petrol station will remain available to road users in the direction of Budapest. Between 24<sup>th</sup> and 29<sup>th</sup> July, the petrol station and the rest area can only be approached by using a diversion route.</p>
<p>Due to the road surface repair works, the truck parking area at Kecskemét south interchange in the direction of Budapest will also be closed between 17<sup>th</sup> and 22<sup>nd</sup> July. During the road surface repair works, Hetény rest area will be available for commuters instead, which is 14 km away from the temporarily closed-off parking lot.</p>
<p>In the last phase of the works, the interchange offramp in the direction of Budapest will be closed-off between 30<sup>th</sup> July and 4<sup>th</sup> August. The traffic will be diverted in the direction of Kecskemét west interchange. Yellow diversion signs will indicate the designated diversion routes for road users.</p>
<p>The road surface repair works are expected to be completed by 7<sup>th</sup> August 2021, after which road users will be able to use the renewed road surfaces. During the reconstruction works the maximum speed will be limited to 40 and 60 km/h, which we kindly ask to comply with.</p>
<p>&nbsp;</p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/07/21P603_Kecskemet_Del_2utem-01.jpg" data-rel="lightbox-gallery-q4FdskbO" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3393 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P603_Kecskemet_Del_2utem-01-1024x619-1.jpg" alt="" width="1024" height="619" /></a></p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/07/21P603_Kecskemet_Del_3utem-01.jpg" data-rel="lightbox-gallery-q4FdskbO" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3394 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P603_Kecskemet_Del_3utem-01-1024x619-1.jpg" alt="" width="1024" height="619" /></a></p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/07/21P603_Kecskemet_Del_5utem_bal_kihajto_zarva-01.jpg" data-rel="lightbox-gallery-q4FdskbO" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3395 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P603_Kecskemet_Del_5utem_bal_kihajto_zarva-01-1024x619-1.jpg" alt="" width="1024" height="619" /></a></p>
<p><a href="https://www.aka.hu/en/wp-content/uploads/2021/07/21P603_tereloutvonal_kecskemet_del-01.jpg" data-rel="lightbox-gallery-q4FdskbO" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="aligncenter wp-image-3396 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/21P603_tereloutvonal_kecskemet_del-01-1024x569-1.jpg" alt="" width="1024" height="569" /></a></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_19  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.<br />
For further information and interviews:</p>
<p>Terdik Adrienne| Ügyvezető igazgató | PResston PR | Rózsadomb Center |<br />
1025 Budapest | Törökvész u. 87-91. | T + 36 1 325 94 88 | F +36 1 325 94 89 |<br />
M +36 30 257 60 08 | <a href="mailto:adrienne.terdik@presstonpr.hu">adrienne.terdik@presstonpr.hu</a> | <a href="http://www.presstonpr.hu">www.presstonpr.hu</a></p>
<p>Szekeres Nikoletta | PR vezető | PResston PR | Rózsadomb Center |<br />
1025 Budapest | Törökvész u. 87-91. | T + 36 1 325 94 88 | F +36 1 325 94 89 |<br />
M +36 30 831 64 56 | <a href="mailto:nikoletta.szekeres@presstonpr.hu">nikoletta.szekeres@presstonpr.hu</a> | <a href="http://www.presstonpr.hu">www.presstonpr.hu</a></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_20  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repairs conducted on the M5 motorway near Szeged</title>
		<link>https://www.aka.hu/en/2021/07/09/road-surface-repairs-conducted-on-the-m5-motorway-near-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Fri, 09 Jul 2021 11:54:25 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244379</guid>

					<description><![CDATA[Road surface repair works will be carried out on M5 Motorway in the proximity of Szeged between 9th and 19th July 2021 in the direction of Budapest between chainage 166 and 170. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_7 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_7">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_7  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_21  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on M5 Motorway in the proximity of Szeged between 9<sup>th</sup> and 19<sup>th</sup> July 2021 in the direction of Budapest between chainage 166 and 170. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p>The repairs will expectedly start on 9<sup>th</sup> July 2021 on the aforementioned sections. During the road surface repair works, there will be one traffic lane available for the travelers in the direction of Budapest between chainage 166 and 170. During these repair works, Szeged West interchange remains available for travelers.</p>
<p>The road surface repairs are expected to be completed by July 19<sup>th</sup> 2021, after which road users will be able to travel on the renewed roads. Speed limits of 60 km/h and 80 km/h are to be expected within the highlighted zone, which we kindly ask to comply with.</p>
<p><div id="attachment_3356" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/07/terelesi_terv_ill_21P411_73szakasz_01.jpg" data-rel="lightbox-gallery-9NImj2d9" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3356" class="wp-image-3356 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/terelesi_terv_ill_21P411_73szakasz_01-1024x373-1.jpg" alt="" width="1024" height="373" /></a><p id="caption-attachment-3356" class="wp-caption-text">Between chainage 166 – 170, in the direction towards Budapest</p></div></p>
<p>&nbsp;</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_22  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="http://www.utinform.hu">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="http://www.aka.hu">www.aka.hu</a> as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p>Presston PR. is the communication partner of AKA Ltd.<br />For further information and interviews:</p>
<p>Terdik Adrienne| Ügyvezető igazgató | PResston PR | Rózsadomb Center |<br />1025 Budapest | Törökvész u. 87-91. | T + 36 1 325 94 88 | F +36 1 325 94 89 |<br />M +36 30 257 60 08 | <a href="mailto:adrienne.terdik@presstonpr.hu">adrienne.terdik@presstonpr.hu</a> | <a href="http://www.presstonpr.hu">www.presstonpr.hu</a></p>
<p>Szekeres Nikoletta | PR vezető | PResston PR | Rózsadomb Center |<br />1025 Budapest | Törökvész u. 87-91. | T + 36 1 325 94 88 | F +36 1 325 94 89 |<br />M +36 30 831 64 56 | <a href="mailto:nikoletta.szekeres@presstonpr.hu">nikoletta.szekeres@presstonpr.hu</a> | <a href="http://www.presstonpr.hu">www.presstonpr.hu</a></p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_23  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works of Kecskemét West interchange, M5 Motorway</title>
		<link>https://www.aka.hu/en/2021/06/23/road-surface-repair-works-of-kecskemet-west-interchange-m5-motorway/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Wed, 23 Jun 2021 11:57:45 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244387</guid>

					<description><![CDATA[Road surface repair works will be carried out at Kecskemét West interchange located at chainage 85, M5 Motorway between 23rd June and 8th July 2021 in both directions. During the repair works the on- and off ramps of Kecskemét West interchange are partially available pursuant to the works scheduled. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_8 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_8">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_8  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_24  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out at Kecskemét West interchange located at chainage 85, M5 Motorway between 23<sup>rd</sup> June and 8<sup>th</sup> July 2021 in both directions. During the repair works the on- and off ramps of Kecskemét West interchange are partially available pursuant to the works scheduled.</strong></p>
<p>In the first phase the on- and off ramp of Kecskemét West interchange in the direction of Budapest will be closed from 23<sup>rd</sup> June to 30<sup>th</sup> June 2021 due to the repair works.</p>
<p>Due to the works, the on- and off ramp of Kecskemét West interchange in the direction of Szeged will be closed from 1<sup>st</sup> July to 8<sup>th</sup> July 2021.</p>
<p>Access to the motorway is possible on a diverted route indicated by yellow traffic diversion signs with using main roads No. 52, 54 and 445.</p>
<p>With introducing speed limit, there will be two lanes ensured for the travellers in both directions, however, during asphalting works with closing the slow lane, there will be only one lane available for the travellers. The directed traffic routs will be indicated by yellow traffic signs for the travellers.</p>
<p>During the pavement reconstruction works the maximum speed will be limited to 60 and 80 km/h.</p>
<p><div style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/06/terelesi_terv_ill_21P503_16szakasz_02_bal-01.jpg" data-rel="lightbox-gallery-ZRTn4lbY" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="wp-image-3307 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/terelesi_terv_ill_21P503_16szakasz_02_bal-01-1024x562-1.jpg" alt="" width="1024" height="562" /></a><p class="wp-caption-text">Kecskemét West interchange Phase I. – onramp towards Budapest, off ramp towards main road No. 52 CLOSED</p></div><div style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/06/tereloutvonalak_1utem_V02.jpg" data-rel="lightbox-gallery-ZRTn4lbY" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="wp-image-3308 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/tereloutvonalak_1utem_V02-1024x528-1.jpg" alt="" width="1024" height="528" /></a><p class="wp-caption-text">Diverted routs towards Budapest and Dunaföldvár</p></div><div id="attachment_3309" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/06/terelesi_terv_ill_21P503_16szakasz_03_jobb-01.jpg" data-rel="lightbox-gallery-ZRTn4lbY" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3309" class="wp-image-3309 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/terelesi_terv_ill_21P503_16szakasz_03_jobb-01-1024x554-1.jpg" alt="" width="1024" height="554" /></a><p id="caption-attachment-3309" class="wp-caption-text">Kecskemét West interchange Phase II. – onramp from main road No 52 towards Szeged CLOSED</p></div><div id="attachment_3310" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/06/tereloutvonalak_2utem_V03.jpg" data-rel="lightbox-gallery-ZRTn4lbY" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3310" class="wp-image-3310 size-large" src="https://www.aka.hu/wp-content/uploads/2022/06/tereloutvonalak_2utem_V03-1024x819-1.jpg" alt="" width="1024" height="819" /></a><p id="caption-attachment-3310" class="wp-caption-text">Diverted routs from main road No. 52 towards Szeged</p></div></p>
<p>&nbsp;</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_25  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on <a href="https://utinform.hu/" target="_blank" rel="noopener noreferrer">www.utinform.hu</a> website, AKA Zrt. on <a href="https://www.aka.hu/en/" target="_blank" rel="noopener noreferrer">www.aka.hu</a> website and the operator &#8211; AWAY Zrt. AKA Zrt. asks travellers to drive more carefully, with keeping the speed limit on the M5 motorway.<br />
Unforeseeable events may result changes in the above mentioned schedule, AKA Zrt. reserves the right to modify the schedule of maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Zrt.</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_26  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works continue on M5 Motorway in the area of Kecskemét</title>
		<link>https://www.aka.hu/en/2021/05/29/road-surface-repair-works-continue-on-m5-motorway-in-the-area-of-kecskemet/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Sat, 29 May 2021 12:01:26 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2021]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=244396</guid>

					<description><![CDATA[Road surface repair works are carried out on M5 Motorway in the area of Kecskemét between 29th May and 23rd June 2021 in the direction of Szeged between chainage 71 and 84 in two phases. <i class="far fa-map" style="background:red;color:white;font-size:20px;padding:3px"></i>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_9 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_9">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_9  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_27  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><strong>Road surface repair works are carried out on M5 Motorway in the area of Kecskemét between 29<sup>th</sup> May and 23<sup>rd</sup> June 2021 in the direction of Szeged between chainage 71 and 84 in two phases. </strong></p>
<p>The works start on 29<sup>th</sup> May 2021 between chainage 71 and 78, temporarily there will be one traffic lane available for the travellers in both directions during installing the traffic diversion. During the road surface repair works between chainage 71 and 78 from the direction of Szeged, one traffic lane will be diverted into the direction of Budapest, ensuring the two traffic lanes for the travellers travelling towards both directions. The traffic diversion continues in second phase of the works between chainage 75 and 84 between 10<sup>th</sup> June and 23<sup>rd</sup> June 2021 with still providing the two lane traffic capacity.</p>
<p>During the reconstruction works Hetény rest area, Kecskemét north interchange and Kecskemét north bypass interchanges are available for travellers.</p>
<p>The weigh station located at chainage 71 of M5 Motorway in the direction of Budapest will be closed until 8<sup>th</sup> June 08:00 p.m. due to maintenance works.</p>
<p>The road surface repair works are expected to be finished foreseeably on 23<sup>rd</sup> June 2021. During demolishing there will be temporarily one traffic lane available for travellers in each direction. During the pavement reconstruction works the maximum speed will be limited to 60 and 80 km/h.</p>
<p><div id="attachment_3255" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_TMA-02.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3255" class="aligncenter wp-image-3255 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_TMA-02_thumb.jpg" alt="" width="1024" height="680" /></a><p id="caption-attachment-3255" class="wp-caption-text">Section 14</p></div></p>
<p><div id="attachment_3257" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_KECSKEMET_ESZAK.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3257" class="aligncenter wp-image-3257 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_KECSKEMET_ESZAK_thumb.jpg" alt="" width="1024" height="524" /></a><p id="caption-attachment-3257" class="wp-caption-text">Section 14</p></div></p>
<p><div id="attachment_3259" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_HETENYI_PIHENO.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3259" class="aligncenter wp-image-3259 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P501_14szakasz_HETENYI_PIHENO_thumb.jpg" alt="" width="1024" height="322" /></a><p id="caption-attachment-3259" class="wp-caption-text">Section 14</p></div></p>
<p><div id="attachment_3262" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_74km75km.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3262" class="wp-image-3262 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_74km75km_thumb.jpg" alt="" width="1024" height="600" /></a><p id="caption-attachment-3262" class="wp-caption-text">Section 15</p></div></p>
<p><div id="attachment_3264" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_HETENYI_PIHENO.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3264" class="wp-image-3264 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_HETENYI_PIHENO_thumb.jpg" alt="" width="1024" height="321" /></a><p id="caption-attachment-3264" class="wp-caption-text">Section 15</p></div></p>
<p><div id="attachment_3266" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_KECSKEMET_ESZAK_ELKERULO.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3266" class="wp-image-3266 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_KECSKEMET_ESZAK_ELKERULO_thumb.jpg" alt="" width="1024" height="529" /></a><p id="caption-attachment-3266" class="wp-caption-text">Section 15</p></div></p>
<p><div id="attachment_3268" style="width: 1034px" class="wp-caption aligncenter"><a href="https://www.aka.hu/en/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_83km_94km.jpg" data-rel="lightbox-gallery-L0Ca8FAV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" aria-describedby="caption-attachment-3268" class="wp-image-3268 size-full" src="https://www.aka.hu/wp-content/uploads/2021/05/terelesi_terv_ill_21P401_15szakasz_83km_94km_thumb.jpg" alt="" width="1024" height="563" /></a><p id="caption-attachment-3268" class="wp-caption-text">Section 15</p></div></p>
<p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_28  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">Information about current traffic restrictions and diversions will be continuously provided by Útinform on <a href="https://utinform.hu/" target="_blank" rel="noopener noreferrer">www.utinform.hu</a> website, AKA Zrt. on <a href="https://www.aka.hu/en/" target="_blank" rel="noopener noreferrer">www.aka.hu</a> website and the operator &#8211; AWAY Zrt. AKA Zrt. asks travellers to drive more carefully, with keeping the speed limit on the M5 motorway.<br />
Unforeseeable events may result changes in the above mentioned schedule, AKA Zrt. reserves the right to modify the schedule of maintenance works.</p>
<p>We wish you a safe trip!</p>
<p>AKA Zrt.</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_29  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"> </div>
<p><a style="position: relative; top: 0px;color:red;" href="https://www.aka.hu/en/former-news/">Former news...</a></p>
<div style="height: 100px;"> </div>
</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
