<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>AKA Zrt</title>
	<atom:link href="https://www.aka.hu/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.aka.hu</link>
	<description></description>
	<lastBuildDate>Thu, 11 Jun 2026 13:27:23 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://www.aka.hu/wp-content/uploads/2020/04/aka_favicon16x16-01.png</url>
	<title>AKA Zrt</title>
	<link>https://www.aka.hu</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Road surface repair works at the Szatymaz rest area on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2026/06/11/road-surface-repair-works-at-the-szatymaz-rest-area-on-the-m5-motorway-in-the-direction-of-szeged-2/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 11 Jun 2026 12:18:52 +0000</pubDate>
				<category><![CDATA[actual]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=248068</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Rest area reconstruction works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the direction of Szeged, Szatymaz rest area at chainage 151</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>11th June 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>20th June 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>30 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><strong>Road surface repair works will be carried out on the M5 Motorway at the Szatymaz rest area located near chainage 151 between 11th and 20th June 2026 in the direction of Szeged. During the road surface repair works the rest area will be partially closed, while the petrol station will remain entirely available in accordance with the works scheduled. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-scaled.jpg" data-rel="lightbox-gallery-2rSvSUfq" data-rl_title="" data-rl_caption="" title=""><img fetchpriority="high" decoding="async" src="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-scaled.jpg" width="2560" height="1454" alt="" class="wp-image-248072 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-1280x727.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-980x557.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P503_v01-480x273.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>Between 11th and 20 June 2026 on the motorway in the direction of Szeged road surface repair works will be carried out at the Szatymaz rest area. During this period, leaving and entering the motorway, as well as accessing the rest area and its facilities, including the petrol station and the parking area for cars, will remain possible for travelers, but the parking area for trucks will only be partially closed. A speed limit of 30 km/h is to be expected within the aforementioned rest area. The repair works are expected to be completed by 20th June 2026.</div>
			</div><div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Balástya on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2026/06/08/road-surface-repair-works-in-the-proximity-of-balastya-on-the-m5-motorway-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 08 Jun 2026 20:48:29 +0000</pubDate>
				<category><![CDATA[actual]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=248058</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Balástya, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>8th June 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>16th June 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_1 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Balástya between 8th and 16th June 2026 in the direction of Szeged between chainage 147 and 149 during which traffic will be diverted. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01.jpg" data-rel="lightbox-gallery-ArIqptPO" data-rl_title="" data-rl_caption="" title=""><img decoding="async" class="wp-image-248049 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-scaled.jpg" alt="" width="2560" height="689" srcset="https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-1280x345.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-980x264.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/06/terelesi_terv_ill_26P502_v01-480x129.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 8th June 2026 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 147 and 149 will first be diverted into the slow lane, and then later into the fast lane. At the Balástya interchange at chainage 147, leaving the motorway is possible, but for traffic entering it, a shortened stretch is provided. The repair works are expected to be completed by 16th June 2026. A speed limit of 60 km/h is to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_4  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_5  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Örkény on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2026/05/26/road-surface-repair-works-in-the-proximity-of-orkeny-on-the-m5-motorway-in-the-direction-of-szeged-2/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Tue, 26 May 2026 10:05:54 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=248025</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>26th May 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>6th June 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>Between 60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_2 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_6  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Örkény between 26th May and 6th June 2026 in the direction of Szeged between chainage 59 and 63. During the road surface repair works, traffic will be diverted at the technical crossings between chainage 57 and 64. On the main track two lanes are available for travelers twice in each direction, except during the installation and dismantling of the diversion. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01.jpg" data-rel="lightbox-gallery-S6CYoLJa" data-rl_title="" data-rl_caption="" title=""><img decoding="async" class="wp-image-248015 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-scaled.jpg" alt="" width="2560" height="561" srcset="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-1280x281.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-980x215.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P404_v01-480x105.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 26th May 2026 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 57 and 64 will be temporarily diverted into the fast lane and into the fast lane of the opposite side, thus ensuring two available lanes for travelers in each direction on the motorway. The repair works are expected to be completed by 6th June 2026. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_7  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_8  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic diversion and offramp closure at the Kecskemét south interchange on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2026/05/04/traffic-diversion-and-offramp-closure-at-the-kecskemet-south-interchange-on-the-m5-motorway-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 04 May 2026 10:45:57 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247984</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Offramp closure</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>4th May 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>22nd May 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>Between 60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_3 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_3  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_9  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Kecskemét between 4th and 22nd May 2026 in the direction of Szeged between chainage 87 and 91. During the road surface repair works, traffic will be diverted at the technical crossings between chainage 87 and 93. Between 5th and 20th May 2026 on the M5 Motorway in the direction of Szeged the offramp of the Kecskemét south interchange at chainage 91 will expectedly be closed due to road surface repair works. On the main track two lanes are available for travelers twice in each direction, except during the installation and dismantling of the diversion. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01.jpg" data-rel="lightbox-gallery-2EzP7Lms" data-rl_title="" data-rl_caption="" title=""><img decoding="async" class="wp-image-247967 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-scaled.jpg" alt="" width="2560" height="418" srcset="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-1280x209.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-980x160.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-01-480x78.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02.jpg" data-rel="lightbox-gallery-2EzP7Lms" data-rl_title="" data-rl_caption="" title=""><img decoding="async" class="wp-image-247968 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02-scaled.jpg" alt="" width="2560" height="1152" srcset="https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02-1280x576.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02-980x441.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/05/terelesi_terv_ill_26P402_v03-02-480x216.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 4th May 2026 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 87 and 93 will be temporarily diverted into the fast lane and into the fast lane of the opposite side, thus ensuring two available lanes for travelers in each direction on the motorway.<br />
Between 5th and 20th May 2026 on the M5 Motorway in the direction of Szeged at the Kecskemét south interchange at chainage 91, leaving the motorway is not possible, but for traffic entering it, a shortened stretch is provided. Due to the traffic diversion, temporarily installed yellow signs guide travelers entering the motorway on both sides of the interchange. During this period leaving the M5 Motorway will be possible at the Kecskemét west interchange at chainage 86 or the Kunszállás interchange at chainage 103.<br />
The repair works are expected to be completed by 22nd May 2026. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_10  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_11  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Kecskemét on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2026/04/13/road-surface-repair-works-in-the-proximity-of-kecskemet-on-the-m5-motorway-in-the-direction-of-szeged-3/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 19:46:08 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247946</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>13th April 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>29th April 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_4 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_4">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_4  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_12  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Kecskemét between 13th and 29th April 2026 in the direction of Szeged between chainage 80 and 87 during which traffic will be diverted. On the main track two lanes are available for travelers twice in each direction, except during the installation and dismantling of the diversion. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02.jpg" data-rel="lightbox-gallery-X37TO91L" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="wp-image-247933 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-scaled.jpg" alt="" width="2560" height="471" srcset="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-1280x236.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-980x180.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02-480x88.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem.jpg" data-rel="lightbox-gallery-X37TO91L" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="wp-image-247934 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem-scaled.jpg" alt="" width="2560" height="645" srcset="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem-1280x323.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem-980x247.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_A_utem-480x121.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem.jpg" data-rel="lightbox-gallery-X37TO91L" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" class="wp-image-247935 aligncenter size-full" src="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem-scaled.jpg" alt="" width="2560" height="645" srcset="https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem-1280x323.jpg 1280w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem-980x247.jpg 980w, https://www.aka.hu/wp-content/uploads/2026/04/terelesi_terv_ill_26P303_v02_B_utem-480x121.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><strong>Between 13th and 25th April 2026</strong> during the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 80 and 86 will be temporarily diverted into the fast lane and partially into the slow lane, thus ensuring two available lanes for travelers in each direction on the motorway. At the Kecskemét west interchange at chainage 86, entering the motorway is possible, but for traffic leaving it, a shortened stretch is provided.<br />
<strong>On 27th April 2026</strong> on the M5 Motorway the traffic in the direction of Szeged between chainage 81 and 82 will be temporarily diverted into the fast lane.<br />
<strong>Between 27th and 29th April 2026</strong> during the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 85 and 87 will be temporarily diverted into the fast lane.<br />
The repair works are expected to be completed by 29th April 2026. A speed limit of 60 km/h is to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_13  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_14  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic restrictions on the M5 motorway – Traffic diversion modification at the M5-M44 interchange under construction</title>
		<link>https://www.aka.hu/en/2026/04/13/traffic-restrictions-on-the-m5-motorway-traffic-diversion-modification-at-the-m5-m44-interchange-under-construction/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 06:00:43 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247908</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Construction works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, between km sections 71-77, in both directions</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>13th April 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>2026 autumn</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_5 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_5">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_5  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_15  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Due to the construction of the M44 expressway, bridge demolition works will be carried out on both sides of the M5 motorway in the proximity of Kecskemét. The next phase of the works start on 13th April 2026. Traffic on the M5 motorway will be restricted to two narrowed lanes in each direction, with traffic diversions and speed limits in place, except during the reconstruction of the traffic diversion. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the demolition works.</strong></p>
<p>On both sides of the M5 motorway between km sections 71 and 77 in the proximity of Kecskemét, the current traffic diversion will be rebuilt from 13th April 2026. Both traffic towards Szeged and towards Budapest will flow on the narrowed slow and fast lanes, with closing the emergency lanes on both sides, ensuring two lanes in each direction on both sides of the motorway.<br />
A speed limit of 60 km/h will be in effect on the affected section.<br />
Drivers are notified in advance of the works on the M5 motorway using variable message signs (VMS).</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_16  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_17  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic restrictions on the M5 motorway – Bridge demolition works at the M5-M44 interchange under construction</title>
		<link>https://www.aka.hu/en/2026/03/25/traffic-restrictions-on-the-m5-motorway-bridge-demolition-works-at-the-m5-m44-interchange-under-construction-2/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Wed, 25 Mar 2026 07:11:57 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247843</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Bridge demolition works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, between km sections 71-77, in both directions</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>25th March 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>8th April 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_6 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_6">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_6  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_18  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Due to the construction of the M44 expressway, bridge demolition works will be carried out on both sides of the M5 motorway in the proximity of Kecskemét. The next phase of the works start on 25th March 2026. Traffic on the M5 motorway will be restricted to two narrowed lanes in each direction, with traffic diversions and speed limits in place, except during the reconstruction of the traffic diversion on 25th March. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the demolition works.</strong></p>
<p>Due to bridge demolition works on both sides of the M5 motorway between km sections 71 and 77 in the proximity of Kecskemét, the current traffic diversion will be rebuilt from 25th March 2026. Both traffic towards Szeged and towards Budapest will flow on the emergency and slow lanes, with closing the fast lanes on both sides, ensuring two lanes in each direction on both sides of the motorway.</p>
<p>The works are expected to be completed by 8th April 2026. A speed limit of 60 km/h will be in effect on the affected section.<br />
Drivers are notified in advance of the works on the M5 motorway using variable message signs (VMS).</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_19  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_20  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic restrictions on the M5 motorway – Bridge demolition works at the M5-M44 interchange under construction with temporary night motorway closure</title>
		<link>https://www.aka.hu/en/2026/03/17/traffic-restrictions-on-the-m5-motorway-bridge-demolition-works-at-the-m5-m44-interchange-under-construction-with-temporary-night-motorway-closure-2/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Tue, 17 Mar 2026 07:00:59 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247814</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Bridge demolition works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, between km sections 71-77, in both directions</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>17th March 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>end of March 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_7 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_7">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_7  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_21  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Due to the construction of the M44 expressway, bridge demolition works will be carried out on both sides of the M5 motorway in the proximity of Kecskemét. The third phase of the works start on 17th March 2026. Traffic on the M5 motorway will be restricted to two narrowed lanes in each direction, with traffic diversions and speed limits in place, except during the reconstruction of the traffic diversion. From 19th March late afternoon until early morning, the works go on with temporary motorway closure. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the demolition works.</strong></p>
<p>Due to bridge demolition works on both sides of the M5 motorway between km sections 71 and 77 in the proximity of Kecskemét, the current traffic diversion will be rebuilt from 17th March 2026. Traffic towards Szeged will flow on the emergency and slow lanes, while traffic towards Budapest will be directed to the fast lane and to fast lane of the opposite side, ensuring two lanes in each direction on both sides of the motorway.<br />
Due to the bridge demolition works from 19th March 2026 late afternoon until 20th March 2026 early morning, one lane of the traffic towards Budapest will be temporary closed, on the opposite side traffic can flow on one traffic lane towards Budapest. During this time, traffic towards Szeged will be able to flow uninterrupted on narrowed lanes.<br />
The works are expected to be completed by the end of March 2026. A speed limit of 60 km/h will be in effect on the affected section.<br />
Drivers are notified in advance of the works on the M5 motorway using variable message signs (VMS).</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_22  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_23  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic restrictions on the M5 motorway – Bridge demolition works at the M5-M44 interchange under construction with temporary night motorway closure</title>
		<link>https://www.aka.hu/en/2026/03/09/traffic-restrictions-on-the-m5-motorway-bridge-demolition-works-at-the-m5-m44-interchange-under-construction-with-temporary-night-motorway-closure/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 09 Mar 2026 18:33:02 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247788</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Bridge demolition works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, between km sections 71-77, in both directions</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>9th March 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>middle of March 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_8 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_8">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_8  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_24  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Due to the construction of the M44 expressway, bridge demolition works will be carried out on both sides of the M5 motorway in the proximity of Kecskemét. The second phase of the works start on 9th March 2026. Traffic on the M5 motorway will be restricted to two narrowed lanes in each direction, with traffic diversions and speed limits in place, except during the reconstruction of the traffic diversion. From 10th March late afternoon until early morning the works go on with temporary motorway closure. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the demolition works.</strong></p>
<p>Due to bridge demolition works on both sides of the M5 motorway between km sections 71 and 77 in the proximity of Kecskemét, the current traffic diversion will be rebuilt from 9th March 2026. Traffic towards Budapest will flow on the emergency and slow lanes, while traffic towards Szeged will be directed to the fast lane and to fast lane of the opposite side, ensuring two lanes in each direction on both sides of the motorway.<br />
Due to the bridge demolition works from 10th March 2026 late afternoon until 11th March 2026 early morning, one lane of the traffic towards Szeged will be temporary closed, on the opposite side the traffic can flow on one traffic lane towards Szeged. During this time, traffic towards Budapest will be able to flow uninterrupted on narrowed lanes.<br />
The works are expected to be completed by mid-March 2026. A speed limit of 60 km/h will be in effect on the affected section.<br />
Drivers are notified in advance of the works on the M5 motorway using variable message signs (VMS).</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_25  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_26  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Traffic restrictions on the M5 motorway – Bridge demolition works at the M5-M44 interchange under construction</title>
		<link>https://www.aka.hu/en/2026/02/12/traffic-restrictions-on-the-m5-motorway-bridge-demolition-works-at-the-m5-m44-interchange-under-construction/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 12 Feb 2026 11:24:01 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2026]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=247764</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Bridge repair works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Kecskemét, between km sections 71-77, in both directions</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>10th February 2026</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>April 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_9 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_9">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_9  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_27  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Due to the construction of the M44 expressway, bridge demolition works will be carried out on both sides of the M5 motorway in the proximity of Kecskemét from 10th February 2026 to early April 2026. Traffic on the M5 motorway will be restricted to two narrowed lanes in each direction, with traffic diversions and speed limits in place. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the demolition works.</strong></p>
<p>Due to bridge demolition works on both sides of the M5 motorway between km sections 71 and 77 in the proximity of Kecskemét, the current traffic diversion will be rebuilt from 10th February 2026. Traffic on both sides will be restricted to narrowed slow- and fast lanes, except during the reconstruction of the traffic diversions, when one traffic lane will be available for travellers.<br />
The works are expected to be completed in early April 2026. A speed limit of 60 km/h will be in effect on the affected section.<br />
Drivers are notified in advance of the works on the M5 motorway using variable message signs (VMS).</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_28  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />
AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_29  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
