<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2024 | AKA Zrt</title>
	<atom:link href="https://www.aka.hu/en/tag/2024-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.aka.hu</link>
	<description></description>
	<lastBuildDate>Thu, 20 Mar 2025 14:49:36 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://www.aka.hu/wp-content/uploads/2020/04/aka_favicon16x16-01.png</url>
	<title>2024 | AKA Zrt</title>
	<link>https://www.aka.hu</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>MERRY CHRISTMAS AND HAPPY NEW YEAR!</title>
		<link>https://www.aka.hu/en/2024/12/17/merry-christmas-and-happy-new-year-2/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Tue, 17 Dec 2024 16:37:12 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246655</guid>

					<description><![CDATA[<img src="https://www.aka.hu/wp-content/uploads/2024/12/AKA-2025-karacsonyi-kepeslap.jpg" style="width:100%;">]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>M5 Motorway is ready for winter maintenance</title>
		<link>https://www.aka.hu/en/2024/11/08/m5-motorway-is-ready-for-winter-maintenance-4/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Fri, 08 Nov 2024 16:36:35 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246624</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;">

<strong>WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS</strong>

</div>
<table id="hirtabla" style="max-width: 95%!important; margin-top: 15px;" cellpadding="3">
<tbody>
<tr>
<td>156,6 km motorway section</td>
</tr>
<tr>
<td>3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya)</td>
</tr>
<tr>
<td>12 dual-purpose vehicles</td>
</tr>
<tr>
<td>7 multifunctional Unimogs, 3 loading vechicles</td>
</tr>
<tr>
<td>6234,47 tons of sodium chloride</td>
</tr>
<tr>
<td>18 tons of calcium chloride</td>
</tr>
<tr>
<td>Monitoring the road conditions every 2 hours during the daytime</td>
</tr>
</tbody>
</table>]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_1 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>AKA Alföld Koncessziós Autópálya Ltd. and the M5 Motorway Operating Company, A-WAY Ltd. ensures the safety and smoothness of winter traffic with rigorous preparations. From 10th November, 2024, their maintenance fleet is fully ready to handle winter weather conditions, supported by regular road patrols and trained professionals. At three operation and maintenance centres – located near Újhartyán, Kiskunfélegyháza and Balástya – the vehicles and their adapters handling the winter maintenance works were prepared and passed the inspections.</strong></p>
<p>AKA Alföld Koncessziós Autópálya Ltd. and the M5 Motorway Operating Company, A-WAY Ltd., carry out tasks instructed for winter operation in accordance with their legal obligations. The motorway and the maintenance fleet are all prepared to run seamlessly during the winter season. Training of the workforce has concluded in accordance with the operating regulations. An on-call service will be provided starting from 10th November up until 15th March. Depending on weather conditions, the duration of this service can be subject of change.</p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics.jpg" data-rel="lightbox-gallery-Rfbk10ZG" data-rl_title="" data-rl_caption="" title=""><img fetchpriority="high" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics.jpg" width="1920" height="1080" alt="" class="wp-image-246611 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics.jpg 1920w, https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics-1280x720.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics-980x551.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/11/2024-Winter-Maintenance-AKA-infographics-480x270.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1920px, 100vw" /></a></p>
<p>The winter maintenance of the 156,5-kilometre-long motorway section is managed by three operation and maintenance centres with the help of vehicles specifically adjusted to the winter operation period. De-icing and snow removal will be carried out by 12 dual-purpose vehicles. In addition, 7 multifunctional Unimogs capable of disseminating salt and ploughing, 3 for loading and if necessary, 4 additional rented vehicles can help with the winter operation of the motorway.</p>
<p>For the salting of the roads, the salt storage facilities of the maintenance centres provide 6234,47 tons of sodium chloride and 18 tons of calcium chloride. At each operation and maintenance centre, the service is managed in 12-hour shifts. The drivers also work in 12-hour shifts, while the dispatcher and road patrol service ensures smooth traffic conditions 24 hours a day.</p>
<p>In order to ensure accident-free and continuous traffic flow, the Operator regularly monitors road conditions every two hours during the day, and every four hours during the night. In order to increase traffic safety, a CCTV camera system continuously monitors traffic at interchanges and rest areas as well. Meteorological stations placed along the motorway relay the latest weather data every five minutes, which is complemented by satellite imagery of the National Meteorological Service updated every 15 minutes, thus the operation of each section is always based on the most up-to-date information.</p>
<p>In order to drive safely travelers may need to reduce their usual travel speed they have been accustomed to during the summer weather conditions.<br />Extreme weather conditions can further complicate the work the maintenance fleet carries out during winter. We ask motorists to exercise increased patience and caution.</p>
<p>Accident-free traffic does not solely depend on operators, it includes the collective effort of drivers as well as the condition of their vehicles. Especially during the winter, it is essential that drivers pay more attention to each other and prepare their vehicles for the winter. It is important that they adjust their usual travel speed to the weather conditions, as extreme winter weather can also be challenging for the maintenance fleet. We ask road users to exercise caution during this period.</p>
<p>Before leaving, we kindly ask to check the latest road condition updates provided by Utinform as well as AKA Ltd., and pay attention to keep the sufficient following distance and traffic rules while travelling!</p>
<p>We wish everyone an accident-free and safe travel!</p>
<p>For further information visit:</p>
<p><a href="https://www.aka.hu/">www.aka.hu</a></p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Before leaving, we kindly ask you to check the latest road information updates provided by Utinform as well as AKA Ltd., and pay attention to keep the sufficient following distance and traffic rules while travelling!</p>
<p>We wish you an accident-free and safe travel!</p>
<p>AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />
Terdik Adrienne, managing director<br />
M: +36302576008, +36308316456<br />
T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Csengele on the M5 Motorway in the direction of Budapest</title>
		<link>https://www.aka.hu/en/2024/11/07/road-surface-repair-works-in-the-proximity-of-csengele-on-the-m5-motorway-in-the-direction-of-budapest/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 07 Nov 2024 18:26:11 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246597</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Csengele, in the direction of Budapest</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>7th November 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>13th November 2024</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_2 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_4  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Csengele between 7th and 13th November 2024 in the direction of Budapest between chainage 128 and 129 during which traffic will be diverted. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01.jpg" data-rel="lightbox-gallery-k1NAA2qg" data-rl_title="" data-rl_caption="" title=""><img decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-scaled.jpg" width="2560" height="971" alt="" class="wp-image-246589 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-1280x486.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-980x372.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/11/terelesi_terv_ill_24P1001_v02-01-480x182.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 7th November 2024 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Budapest between chainage 128 and 129 will first be diverted into the slow lane, and then later into the fast lane. The repair works will not affect any interchanges and are expected to be completed by 13th November 2024. Speed limits of 60 and 80 km/h are to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_5  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_6  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Szatymaz on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2024/10/25/road-surface-repair-works-in-the-proximity-of-szatymaz-on-the-m5-motorway-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Fri, 25 Oct 2024 10:11:44 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246579</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Szatymaz, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>26th October 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>8th November 2024</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>Between 60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P1002_v01-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_3 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_3  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_7  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Szatymaz between 26th October and 8th November 2024 in the direction of Szeged between chainage 154 and 155. During the road surface repair works, traffic will be diverted between chainage 153 and 155. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><strong><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P1002_v01-01.jpg" data-rel="lightbox-gallery-BPSYLnoj" data-rl_title="" data-rl_caption="" title=""><img decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P1002_v01-01-scaled.jpg" width="2560" height="826" alt="" class="wp-image-246550 aligncenter size-full" /></a></strong></p>
<p>The repairs will expectedly start on 26th October 2024 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 153 and 155 will first be diverted into the slow lane, and then later into the fast lane. The repair works will not affect any interchanges and are expected to be completed by 8th November 2024. Speed limits of 60 and 80 km/h are to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_8  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_9  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Örkény on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2024/10/17/road-surface-repair-works-in-the-proximity-of-orkeny-on-the-m5-motorway-in-the-direction-of-szeged/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 17 Oct 2024 17:17:07 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246558</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Örkény, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>16th October 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>6th November 2024</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>Between 60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_4 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_4">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_4  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_10  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Örkény between 16th October and 6th November 2024 in the direction of Szeged between chainage 52 and 54. During the road surface repair works, traffic will be diverted at the technical crossings between chainage 49 and 57. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><strong><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01.jpg" data-rel="lightbox-gallery-vUEVOQ4v" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-scaled.jpg" width="2560" height="384" alt="" class="wp-image-246550 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-1280x192.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-980x147.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_A_utem-01-480x72.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></strong></p>
<p><strong><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01.jpg" data-rel="lightbox-gallery-vUEVOQ4v" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01-scaled.jpg" width="2560" height="384" alt="" class="wp-image-246551 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01-1280x192.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01-980x147.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P802_v03_B_utem-01-480x72.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></strong></p>
<p>During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 49 and 57 will be temporarily diverted into the fast lane and into the fast lane of the opposite side. The traffic in the direction of Szeged between chainage 55 and 57 will be diverted partially into the slow lane and the emergency lane, and later with the progression of the repair works travelers can use the fast lane. During the traffic restriction, travelers in the direction of Szeged can leave the motorway at the Örkény interchange in case if they drive in the diversion of Szeged. During the works entering and leaving the interchange will be possible. The restrictions will also affect the motorway in the direction of Budapest, where the traffic will be temporarily diverted into the slow lane and the emergency lane.</p>
<p>Speed limits of 60 and 80 km/h are to be expected within the aforementioned section.</p>
<p>The repair works are expected to be completed by 6th November 2024.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_11  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_12  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Kecskemét north interchange closure due to construction of the M44 Expressway</title>
		<link>https://www.aka.hu/en/2024/10/10/kecskemet-north-interchange-closure-due-to-construction-of-the-m44-expressway/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 10 Oct 2024 12:44:51 +0000</pubDate>
				<category><![CDATA[actual]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246517</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>M5-M44 interchange construction works</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway first in the direction of Budapest, then afterwards in the direction of Szeged, Kecskemét north interchange at chainage 74</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>10th October 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>Autumn 2026</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_5 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_5">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_5  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_13  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>On the M5 Motorway the Kecskemét north interchange at chainage 74 will expectedly be closed from 10th October 2024 until autumn 2026 due to construction works carried out at the interchange of the M5 Motorway and the M44 Expressway. On the motorway in the direction of Budapest the offramp will be closed from 10th October 2024. Entering the motorway at this interchange towards Budapest will be possible from the direction of Kecskemét. On the motorway in the direction of Szeged the off- and onramp will be closed from 14th October 2024. During this period, traffic will be diverted between chainage 72 and 76. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02.jpg" data-rel="lightbox-gallery-9IyZEwqt" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-scaled.jpg" width="2560" height="856" alt="" class="wp-image-246508 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-1280x428.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-980x328.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02-02-480x161.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03.jpg" data-rel="lightbox-gallery-9IyZEwqt" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03-scaled.jpg" width="2560" height="1095" alt="" class="wp-image-246507 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03-1280x548.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03-980x419.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_Eszak_elkerulo-03-480x205.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04.jpg" data-rel="lightbox-gallery-9IyZEwqt" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04-scaled.jpg" width="2560" height="1954" alt="" class="wp-image-246506 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04-1280x977.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04-980x748.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/10/terelesi_terv_ill_24P905_v02_445_5_sz-csomopont-04-480x366.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>From 10th October 2024 on the M5 Motorway in the direction of Budapest the offramp of the Kecskemét north interchange at chainage 74 will expectedly be closed, the onramp from the direction of Kecskemét will remain accessible for travelers. During this period, traffic on both sides of the motorway will be diverted between chainage 72 and 76. The emergency lanes will be closed, thus traffic will be able to move on narrower tracks on the slow and the fast lanes with a speed limit.</p>
<p>From 14th October 2024 on the motorway in the direction of Szeged the off- and onramp of the Kecskemét north interchange will be closed. Leaving and entering the M5 Motorway will be possible at the Lajosmizse interchange at chainage 68 or the Kecskemét north bypass interchange at chainage 81. At the interchange, main road No. passing over the motorway will remain accessible with temporary traffic restrictions. Travelers on main road No. 5 from Lajosmizse to Kecskemét will not be able to turn onto the onramp of the motorway in the direction of Budapest.</p>
<p>A speed limit of 60 km/h is to be expected within the aforementioned section. The repair works are expected to be completed by autumn 2026</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_14  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_15  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Lajosmizse interchange ramps repair works and periodical closure of the rest area on the M5 Motorway in the direction of Budapest</title>
		<link>https://www.aka.hu/en/2024/10/03/lajosmizse-interchange-ramps-repair-works-and-periodical-closure-of-the-rest-area-on-the-m5-motorway-in-the-direction-of-budapest/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Thu, 03 Oct 2024 10:32:01 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246481</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Off- and onramp and rest area closure</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the direction of Budapest, Lajosmizse interchange and rest area at chainage 68</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>3rd October 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>12th November 2024</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_6 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_6">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_6  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_16  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway at Lajosmizse interchange and rest area located near chainage 68 between 3rd October and 12th November 2024 in the direction of Budapest. During certain phases of the road surface repair works the closure of interchange ramps and the rest area is to be expected. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01.jpg" data-rel="lightbox-gallery-Rl363xmv" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246445 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01.jpg" data-rel="lightbox-gallery-Rl363xmv" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246446 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01.jpg" data-rel="lightbox-gallery-Rl363xmv" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246449 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02.jpg" data-rel="lightbox-gallery-Rl363xmv" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-scaled.jpg" width="2560" height="1377" alt="" class="wp-image-246447 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-1280x689.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-980x527.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-480x258.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03.jpg" data-rel="lightbox-gallery-Rl363xmv" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-scaled.jpg" width="2560" height="1686" alt="" class="wp-image-246448 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-1280x843.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-980x645.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-480x316.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><strong>Between 3rd October and 14th October 2024</strong><br />• The petrol station, the rest area and the restaurant will remain accessible for travelers leaving the motorway.<br />• Entering the motorway from Lajosmizse and Cegléd in the direction of Budapest will not be possible.<br />• Entering the motorway in the direction of Budapest at the Kecskemét north interchange will be possible.</p>
<p><strong>Between 14th and 19th October 2024</strong><br />• The petrol station will be accessible for travelers.<br />• The rest area and the restaurant will not be accessible for travelers.</p>
<p><strong>Between 21st October and 12th November 2024</strong><br />• The Lajosmizse interchange and rest area will be fully closed, hence leaving and entering the motorway will not be possible.<br />• Entering the M5 Motorway in the direction of Budapest will be possible via detour routes at the Kecskemét north or Örkény interchanges.</p>
<p>Temporarily installed yellow signs guide travelers on the motorway.<br />A speed limit is to be expected within the aforementioned section. The repair works are expected to be completed by 12th November 2024.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_17  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_18  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Lajosmizse rest area reconstruction works, left side – infographics</title>
		<link>https://www.aka.hu/en/2024/09/30/lajosmizse-rest-area-reconstruction-works-left-side-infographics/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 30 Sep 2024 09:28:54 +0000</pubDate>
				<category><![CDATA[Kategória nélküli]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246459</guid>

					<description><![CDATA[<img src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_7 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_7">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_7  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_19  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01.jpg" data-rel="lightbox-gallery-phPIx0Xo" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246445 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_I_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01.jpg" data-rel="lightbox-gallery-phPIx0Xo" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246446 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_II_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01.jpg" data-rel="lightbox-gallery-phPIx0Xo" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg" width="2560" height="1059" alt="" class="wp-image-246449 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-1280x530.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-980x405.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_v01-01-480x199.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02.jpg" data-rel="lightbox-gallery-phPIx0Xo" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-scaled.jpg" width="2560" height="1377" alt="" class="wp-image-246447 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-1280x689.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-980x527.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Kecskemet-Eszak_v01-02-480x258.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03.jpg" data-rel="lightbox-gallery-phPIx0Xo" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-scaled.jpg" width="2560" height="1686" alt="" class="wp-image-246448 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-1280x843.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-980x645.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P903_III_utem_terelesi_utvonal_Orkeny_csmp_v01-03-480x316.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>&nbsp;</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_20  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_21  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Szeged north interchange ramp closure on the M5 Motorway in the direction of the border crossing</title>
		<link>https://www.aka.hu/en/2024/09/20/szeged-north-interchange-ramp-closure-on-the-m5-motorway-in-the-direction-of-the-border-crossing/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Fri, 20 Sep 2024 14:51:36 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246410</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Onramp closure</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Szeged, in the direction of the border crossing</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>20th September 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>15th October 2024</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>100 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_8 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_8">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_8  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_22  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>On the M5 Motorway in the direction of the border crossing the onramp of the Szeged north interchange at chainage 159 will expectedly be closed between 20th September and 15th October 2024 due to road surface repair works. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02.jpg" data-rel="lightbox-gallery-44N1Iszh" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-scaled.jpg" width="2560" height="1979" alt="" class="wp-image-246402 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-1280x990.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-980x758.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P804_v02-02-480x371.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 20th September 2024 on the aforementioned section. On the M5 Motorway in the direction of the border crossing the onramp of the Szeged north interchange at chainage 159 will be closed. Access to the border crossing for traffic entering at the Szeged north interchange will be possible via a detour route turning around at the Balástya interchange at chainage 147. The repair works are expected to be completed by 15th October 2024. A speed limit of 100 km/h is to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_23  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_24  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Road surface repair works in the proximity of Lajosmizse on the M5 Motorway in the direction of Szeged</title>
		<link>https://www.aka.hu/en/2024/09/09/road-surface-repair-works-in-the-proximity-of-lajosmizse-on-the-m5-motorway-in-the-direction-of-szeged-4/</link>
		
		<dc:creator><![CDATA[AKA]]></dc:creator>
		<pubDate>Mon, 09 Sep 2024 15:00:32 +0000</pubDate>
				<category><![CDATA[archive]]></category>
		<category><![CDATA[2024]]></category>
		<guid isPermaLink="false">https://www.aka.hu/?p=246332</guid>

					<description><![CDATA[<div style="height: 10px!important; clear: both;"></div>
<table id="hirtabla" style="max-width: 100%; margin-top: 15px;" cellpadding="5">
<tbody>
<tr>
<td>Type:</td>
<td>Road surface repair and weigh station closure</td>
</tr>
<tr>
<td>Location:</td>
<td>M5 motorway in the proximity of Lajosmizse, in the direction of Szeged</td>
</tr>
<tr>
<td>Expected start of maintenance:</td>
<td>9th September 2024</td>
</tr>
<tr>
<td>Expected finish of maintenance:</td>
<td>4th October 2024</td>
</tr>
<tr>
<td>Speed limit:</td>
<td>60 and 80 km/h</td>
</tr>
</tbody>
</table>
<img src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-scaled.jpg" />]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_9 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_9">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_9  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_25  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Road surface repair works will be carried out on the M5 Motorway in the proximity of Lajosmizse between 9th and 4th October 2024 in the direction of Szeged between chainage 66 and 68. During the road surface repair works, traffic will be diverted at the technical crossings between chainage 63 and 72. Two lanes are available for travelers twice in each direction, except during the installation and dismantling of the diversion. During the works the weigh station will be closed. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.</strong></p>
<p><a href="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01.jpg" data-rel="lightbox-gallery-CYZVKGtV" data-rl_title="" data-rl_caption="" title=""><img loading="lazy" decoding="async" src="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-scaled.jpg" width="2560" height="451" alt="" class="wp-image-246424 aligncenter size-full" srcset="https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-scaled.jpg 2560w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-1280x226.jpg 1280w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-980x173.jpg 980w, https://www.aka.hu/wp-content/uploads/2024/09/terelesi_terv_ill_24P702_v04-01-480x85.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></p>
<p>The repairs will expectedly start on 9th September 2024 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 63 and 72 will be diverted into the fast lane and into the fast lane of the opposite side. Between 9th and 4th October 2024 the weigh station at chainage 72 in the direction of Budapest will also be closed.<br />Between 21st September and 4th October 2024, on the M5 Motorway in the direction of Szeged, road surface repair works will also be carried in two phases on the acceleration lane after the onramp of the Lajosmizse interchange at chainage 68, which will involve speed restrictions.<br />The repair works are expected to be completed by 4th October 2024. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_26  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="height: 30px;"></div>
<div class="et_pb_module et_pb_text et_pb_text_1 et_pb_text_align_left et_pb_bg_layout_light">
<div class="et_pb_text_inner">
<p>Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website <a href="https://www.utinform.hu/" target="_blank" rel="noopener">www.utinform.hu</a>, and by AKA Ltd. on their website <a href="https://www.aka.hu/" target="_blank" rel="noopener">www.aka.hu</a> as well as the operator – A-WAY Ltd.<br />AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.</p>
<p>We wish you a safe trip!<br />AKA Ltd.</p>
<p>&nbsp;</p>
<p><strong><u>For further information and interviews please contact:</u></strong></p>
<p><strong>PResston PR</strong></p>
<p>E-mail: <a href="mailto:info@presstonpr.hu">info@presstonpr.hu</a><br />Terdik Adrienne, managing director<br />M: +36302576008, +36308316456<br />T: +3613259488</p>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_27  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div style="clear: both; height: 40px;"></div>
<p><a style="position: relative; top: 0px;" href="https://www.aka.hu/en/former-news/">Other actual news&#8230;</a></p>
<div style="height: 100px;"></div></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
