Road surface repair works will be carried out on M5 Motorway in the area of Petőfiszállás between 6th July and 16th July 2020 in the direction of Budapest between chainage 122 and 127 km.

The works start on 6th July 2020 on the affected sections. The traffic in the direction of Budapest will be diverted from the fast lane into the slow and emergency lanes between chainage 122 and 127 km during the road surface repair works with closing the fast lane.

The road surface repair works are expected to be finished foreseeably on 16th July 2020 with demolishing the traffic diversion, during this period there will be one traffic lane available for the travellers.

During the pavement reconstruction works the maximum speed will be limited to 80 km/h. 

 

 

Information about current traffic restrictions and diversions will be continuously provided by Útinform on www.utinform.hu website, AKA Zrt. on www.aka.hu website and the operator – AWAY Zrt. AKA Zrt. asks travellers to drive more carefully, with keeping the speed limit on the M5 motorway.
Unforeseeable events may result changes in the above mentioned schedule, AKA Zrt. reserves the right to modify the schedule of maintenance works.

We wish you a safe trip!

AKA Zrt.

Accessibility