Road surface repair works will be carried out on M5 Motorway between 10th June and 19st June 2020 in the direction of Budapest between chainage 169 and 174 km.

The works start on 10 June 2020 on the affected sections. The traffic in the direction of Budapest will be diverted from the fast lane into the slow and emergency lanes between chainage 169 and 174 km during the road surface repair works with closing the fast lane.

The works affect Röszke interchange and rest area, however, travellers will be able to leave and enter the motorway from both directions at Röszke interchange. The road surface repair works are expected to be finished foreseeably on 19th June 2020 with demolishing the traffic diversion, during this period there will be one traffic lane available for the travellers.

During the pavement reconstruction works the maximum speed will be limited to 60 and 80 km/h.

Information about current traffic restrictions and diversions will be continuously provided by Útinform on www.utinform.hu website, AKA Zrt. on www.aka.hu website and the operator – AWAY Zrt. AKA Zrt. asks travellers to drive more carefully, with keeping the speed limit on the M5 motorway.
Unforeseeable events may result changes in the above mentioned schedule, AKA Zrt. reserves the right to modify the schedule of maintenance works.

We wish you a safe trip!

AKA Zrt.

Accessibility