Road surface repair works will be carried out on M5 Motorway in the area of Ócsa between 14th May and 26th May 2020 in the direction of Budapest between chainage 25 and 32.

On the motorway the traffic in the direction of Budapest will be diverted from the slow lane into the fast lane with closing the fast and emergency lanes between chainage 25 and 32 km during the road surface repair works. The works affect Ócsa interchange, however, travellers will be able to leave and enter the motorway from both directions at Röszke interchange

The road surface repair works are expected to be finished foreseeably on 26th May 2020. During the pavement reconstruction works the maximum speed will be limited to 60 and 80 km/h. 

 

Information about current traffic restrictions and diversions will be continuously provided by Útinform on www.utinform.hu website, AKA Zrt. on www.aka.hu website and the operator – AWAY Zrt. AKA Zrt. asks travellers to drive more carefully, with keeping the speed limit on the M5 motorway.
Unforeseeable events may result changes in the above mentioned schedule, AKA Zrt. reserves the right to modify the schedule of maintenance works.

We wish you a safe trip!

AKA Zrt.

Accessibility